1. DRIVE SPROCKET 1. Remove the ball bearing using ST.
|
Inspection
1. Remove the bulkhead harness connector from TCM. Transmission Control Module (TCM) > REMOVAL2. Set the ST between the TCM and bulkhead harness.ST 18460AA040CHECK BOARD3. Set the probe of oscilloscope to the check board connector.Terminals:No. 13 (+) — No. 26 (−)(A)+ probe(B)− pro ...