1. Start and warm up the engine. 2. Shift the select lever to “P” or “N” range. 3. Depress the brake pedal and hold it. 4. Check “secondary pressure sensor voltage” by using Subaru Select Monitor while the engine is idling. Subaru Select Monitor > OPERATION Specification: Approx. 0.8 V 5. Check “secondary pressure sensor voltage” by using Subaru Select Monitor while the engine is stopped and the ignition switch is turned on. Subaru Select Monitor > OPERATION Specification: Approx. 0.5 V |
Installation
CAUTION:• Do not start the engine before charging refrigerant.• If the engine is started with no refrigerant charge, replace the compressor assembly.• If the condenser has been replaced, add an appropriate amount of compressor oil to the compressor. Compressor Oil > ADJUSTMENT&bul ...