1. Measure the resistance between connector terminals. Preparation tool: Circuit tester
2. Apply battery voltage between the connector terminals to check lighting condition of illumination inside the switch.
3. Replace the SRF OFF switch if the inspection result is not within the standard value. |
Installation
1. Install the throttle body to the intake manifold assembly.NOTE:Use a new gasket.Tightening torque:8 N·m (0.8 kgf-m, 5.9 ft-lb)2. Connect the connector to the throttle position sensor.3. Connect the preheater hoses to the throttle body.4. Install the air intake boot. Air Intake Boot > INST ...