Unit inspection Preparation tool: Circuit tester 1. Check the resistance between connector terminals.
2. If the inspection result is not within the standard, replace the button - opener rear gate. |
Removal
InstallationCaution
Before disconnecting connectors of sensors or units, be sure to disconnect the ground cable from battery. When replacing the electrical parts provided with memory functions that store contents specified by a customer, record the memory contents before disconnecting the battery ground cable.1. HFC-13 ...