1. Install the panel center LWR. 2. Install the console box assembly. 3. Install the cover assembly - front. 4. Install the shift knob. (MT model) NOTE: For 6MT model, refer to “MT GEAR SHIFT LEVER” in “CS” section. MT Gear Shift Lever > INSTALLATION 5. Install the ornament panel - console. 6. Connect the ground terminal to battery sensor. NOTE |
Preparation tool
1. SPECIAL TOOLILLUSTRATIONTOOL NUMBERDESCRIPTIONREMARKS — (Newly adopted tool)SUBARU SELECT MONITOR 4Used for setting of each function and troubleshooting for electrical system.NOTE:For detailed operation procedures of Subaru Select Monitor 4, refer to “Application help”.2. GENERAL TO ...