CAUTION: For installation of the rod - power rear gate, refer to “INSTALLATION”, “Power Rear Gate Rod” in the “POWER REAR GATE” section and observe the precautions for installation. Power Rear Gate Rod > INSTALLATION 1. Install the trim panel - rear gate LWR. (1) Install the power rear gate inner switch. (2) Install the hand grip. Tightening torque: 7.5 N·m (0.8 kgf-m, 5.5 ft-lb) 2. Install the trim panel - rear gate pillar side. 3. Install the trim panel - rear gate pillar UPR. |
Installation
CAUTION:Before handling the airbag system components, refer to “CAUTION” of “General Description” in “AIRBAG SYSTEM”. General Description > CAUTION1. When replacing the actuator with a new part, apply a thin coat of grease evenly to the side face (a) of lever pin ...