1. When replacing the actuator with a new part, apply a thin coat of grease evenly to the contact area (a) inside the rail of link plate by using approx. 5 mm (0.2 in) width and approx. 0.1 g (0.004 oz) of grease squeezed out from a tube. Also apply a thin coat of grease evenly to the contact areas (b) through (f), by using the same amount of grease to each area. NOTE: After installing the actuator, perform 3 — 5 times of adaptation for the grease to fit in. Grease: SUBARU genuine grease (Part No. 72129AJ000) 2. Install the motor - actuator mode and the link plate to the cover - actuator. 3. Install the motor - actuator assembly. 4. Install the panel - knee guard. Tightening torque: 7 N·m (0.7 kgf-m, 5.2 ft-lb) 5. Install the cover assembly - instrument panel LWR driver. 6. Connect the ground terminal to battery sensor. NOTE |
Inspection
1. Check that the engine coolant temperature sensor has no deformation, cracks or other damages.2. Immerse the engine coolant temperature sensor and a thermometer in water.CAUTION:Take care not to allow water to get into the engine coolant temperature sensor connector. Completely remove any water in ...