1. RH SIDE 1. Install the spark plugs using a spark plug socket. Tightening torque: 18 N·m (1.8 kgf-m, 13.3 ft-lb) 2. Install the ignition coil. CAUTION: Degrease the ignition coil fixing portion and the ignition coil mounting bolt. Tightening torque: 8.0 N·m (0.8 kgf-m, 5.9 ft-lb) 3. Connect the connector to the ignition coil. 4. Install the air cleaner element and air cleaner case (rear). Air Cleaner Element > INSTALLATION 5. Connect the ground terminal to battery sensor. NOTE 2. LH SIDE 1. Install the spark plugs using a spark plug socket. Tightening torque: 18 N·m (1.8 kgf-m, 13.3 ft-lb) 2. Install the ignition coil. CAUTION: Degrease the ignition coil fixing portion and the ignition coil mounting bolt. Tightening torque: 8.0 N·m (0.8 kgf-m, 5.9 ft-lb) 3. Connect the connector to the ignition coil. 4. Install the battery. Battery > INSTALLATION |
Dtc p2011 tgv control circuit/open bank 2
DTC DETECTING CONDITION:Immediately at fault recognitionCAUTION:After servicing or replacing faulty parts, perform Clear Memory Mode Clear Memory Mode > OPERATION, and Inspection Mode Inspection Mode > PROCEDURE.WIRING DIAGRAM:• Engine Electrical System ENGINE TYPE FB (WITHOUT PUSH BUTTON ST ...