1. Install the oil drain plug and overflow drain plug. NOTE: Overflow plug of differential gear oil is temporarily attached. 2. Install all plugs. NOTE: Use new O-rings. Tightening torque: 25 N·m (2.5 kgf-m, 18.4 ft-lb) 3. Install the transmission hanger and transmission radio ground cord. Tightening torque: 41 N·m (4.2 kgf-m, 30.2 ft-lb) |
Removal
1. HIGH BEAMCAUTION:• Do not perform work with wet hands, because there is a possibility of electrical shock.• Do not leave the light assembly - head without the bulb for a long time. Dust, moisture, etc. entering the light may affect its performance.1. Disconnect the ground terminal fro ...