1. Measure the resistance between connector terminals. Preparation tool: Circuit tester
2. Replace the power rear gate inner switch, if the inspection result is not within the standard value. |
Assembly
1. Install the oil drain plug and overflow drain plug.NOTE:Overflow plug of differential gear oil is temporarily attached.2. Install all plugs.NOTE:Use new O-rings.Tightening torque:25 N·m (2.5 kgf-m, 18.4 ft-lb)3. Install the transmission hanger and transmission radio ground cord.Tightening ...